The first of these email types will be from the Designer to Purchasing requesting an order and attaching the quote.
Note: If the NP number cannot be found - open the Hardware Designers Projects sheet and search the PCB column with the PCB number from the email. This will provide the NP number
________________________________________________________________________________________________________________________________________________________________
The second of these email types will be from Purchasing to Paul requesting confirmation to proceed with the order. Paul will confirm back to Purchasing confirming to proceed with the order (These email comments also need to be added to the NP Smartsheet).
________________________________________________________________________________________________________________________________________________________________
The third of these emails will be from Purchasing confirming that the PCB boards have been ordered on PILTD-PO order number. A purchase order number will be given to the Designer to use when ordering the stencils.
Note: The target text blacked out shows RECEIVED 06/03/24 - This is to be ignored at this stage.
Note: The Purchase Order Report is run every couple of days which will determine the status of the order. Notes can be found under "Run Purchase Order Reports".
________________________________________________________________________________________________________________________________________________________________
The fourth of these emails is from the Hardware Designer to the stencil manufacturer (Sparks Laser Services) with a copy to Purchasing.
Note: Once the Stencils are ordered, Hardware needs to send 2 more emails to enable the project to move out of the Hardware column. Slots need booking, BOMs need to be done. The 2 emails can be found under Email: Build Request.
You are done. Great job!